Send Message
Home ProductsAluminum alloy rod

7075 Extruded Aluminum Alloy Rod Round Bar 1000mm Width

Certification
China ShanXi TaiGang Stainless Steel Co.,Ltd certification
China ShanXi TaiGang Stainless Steel Co.,Ltd certification
I'm Online Chat Now

7075 Extruded Aluminum Alloy Rod Round Bar 1000mm Width

7075 Extruded Aluminum Alloy Rod Round Bar 1000mm Width
7075 Extruded Aluminum Alloy Rod Round Bar 1000mm Width
7075 Extruded Aluminum Alloy Rod Round Bar 1000mm Width 7075 Extruded Aluminum Alloy Rod Round Bar 1000mm Width

Large Image :  7075 Extruded Aluminum Alloy Rod Round Bar 1000mm Width

Product Details:
Place of Origin: Shanxi,China
Brand Name: ShanXi Taigang Stainless Steel Co., Ltd.
Certification: CE
Model Number: Round rod
Payment & Shipping Terms:
Minimum Order Quantity: 10 Tons
Price: UAS 2100
Packaging Details: According to customer needs
Delivery Time: 8-14 days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 20000 Metric Ton/Metric Tons per Month

7075 Extruded Aluminum Alloy Rod Round Bar 1000mm Width

Description
Name:: 7075 Alloy Extruded Aluminum Rod /aluminum Round Bar Package:: Suitable
Technique:: Hot Rolled Annealing, Hot Rolled ,hot Forged MOQ:: 4/5/6/7 Inches
Length:: 5.88M Processing Service:: Bending, Decoiling, Welding, Punching, Cutting
PRICE TERM:: CIF CFR FOB Ex-Work Surface:: Mill Finish Polished
Standard:: ASTM, GB, JIS, GB,ROCT,JIS,ASTM,ISO Model Number:: Alloy Structural Steel Bar
High Light:

Alloy Extruded Aluminum Rod Round Bar

,

Alloy Aluminum 7075 Rod Bar

,

1000mm Alloy Aluminum Rod

7075 alloy extruded aluminum rod /aluminum round bar

 

Product Description

 

Aluminum rods need to be packaged and shipped out of the factory after production. The existing packaging process generally requires the aluminum rod to be hoisted to a suitable position by driving, and then wrapped with aluminum tape after each layer is stacked. For the placement of each layer of aluminum rods, the driving needs to be adjusted repeatedly, which affects the efficiency.

 

Description of application effect

 

The ultimate goal of the melting and casting process is to produce aluminum rods that meet the requirements, and to produce these
aluminum rods, it must go through the process: smelting → casting → saw rod → aluminum rod homogenization → cooling, washing rod →
aluminum rod into the warehouse. Extrusion process: Preparation before pressing → Extrusion → Stretching and straightening →
Sawing finished product → Framing and trimming

 

7075 Extruded Aluminum Alloy Rod Round Bar 1000mm Width 07075 Extruded Aluminum Alloy Rod Round Bar 1000mm Width 17075 Extruded Aluminum Alloy Rod Round Bar 1000mm Width 27075 Extruded Aluminum Alloy Rod Round Bar 1000mm Width 3

 

 

Property Anti-corrosion, heat resistant
Surface Mill finish, no stains, withour rough selvedge


Alloy
1100/1050/1060/1070/1200/1350
3003/3004/3104/3005/3105
2014/2017A/2024/2A12/2219
5005/5052/5082/8083/5182/5251/5454/5754
6061/6082/6063/6K61/6Z61
7072/7075
8011
Temper HO,H12,H14,H16,H18,H19,H22,H24,H26,H28,F,H112,T651,T3,T451,T4,T6,ect
Process Hot rolled &Cold rolled
Thickness 0.2mm-300mm
Width 900mm-3000mm
Length Max 11000mm
Standard GBT3880-2012,AMS-QQA-250/12,AMS-4027,BS1470, ASTMB209, EN485 and JIS H4000
Package Export wooden pallets, craft paper, anti-blushing agent.
Application Building,Boat,Truck,Tanker,Machine
Quality of material Totally free frim defects like white rust, roll marks, efge damage, camber, denrs, holes, break lines, scratches and free from
coil set.
Remark details can be discussed further.

 

 

 

FAQ

 

Q1. How long can make delivery?
A: For stock products,will make shipments in 2-5 days after receiving deposit or receiving T/T;
for products need new production for common materials,usually make shipments in 7-10 days;
for products need new products for special and rare materials,usually need 15-20 days to make shipment.

Q2. Can you provide the samples?
A:Samples can be provided with samples' charge and courier fee by the buyer's side.

Q3. What's your payment terms?
A: Down payments 30%TT and balance 70% TT or L/C.

Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive.
Airline and sea shipping also optional.
For mass products, ship freight is prefered.

Q5. Can you accept customized?
A: Yes. It can be customized as per the customers' request.

Q6. How to ensure the quality?
A:Mill Test Certificate is supplied with shipment.

 

 

 

Contact Details
ShanXi TaiGang Stainless Steel Co.,Ltd

Contact Person: Johnny

Tel: 13395131255

Fax: 86-133-9513-1255

Send your inquiry directly to us (0 / 3000)